By Rafaela Martins
Despite the common belief that buying a home under construction is mostly a bet on price, what I see is something else: when you buy off-plan, you are buying a timetable and a contract. The home does not exist yet. What exists is paper, and that paper decides whether the wait goes well.
So this is not another checklist. It is a reading of two things: what Portuguese law already does for you when you buy a home under construction in Portugal, and what is left out and has to be requested and written into the contract.
A note before we start: I am not a lawyer. What follows is the map I use to prepare these conversations. The final contract should be read by a lawyer or solicitor you trust.
Let us take it step by step.
What does the law already do for you in the promissory contract?
In a promise to buy a unit “already built, under construction or to be built”, the Portuguese Civil Code (article 410(3)) requires a written document, with signatures recognised in person and with certification, by whoever recognises them, that a building or occupancy licence exists.
There is a detail few articles explain. The same article says the seller can only rely on the lack of these requirements if it was caused, through fault, by the buyer. In practice, the formality exists mainly to protect the buyer. Waiving it means waiving a protection the law gives you.
My advice is simple: read the licence number in the contract and check it. Without a building licence, there is no home under construction. There is an intention.
What happens to the deposit if the works are never finished?
The deposit (sinal) is usually between 10% and 20% of the price. The rule in article 442 of the Civil Code is well known: if the buyer fails, the seller keeps the deposit; if the seller fails, the buyer can demand double what was paid. Alternatively, the party that complied can seek specific performance (article 830), that is, ask a court to enforce the sale the other party refuses.
What that rule does not solve is the scenario that worries off-plan buyers most: the developer running out of money halfway. DECO PROteste, the Portuguese consumer association, lists the insolvency of the builder or developer as one of the risks of buying off-plan. Being entitled to double the deposit and actually getting it are different things.
I did not find in Portuguese law a general obligation for developers to provide a bank guarantee over the deposits they receive. If you want one, you have to ask for it and write it into the contract. The question is worth asking even if the answer is no: the way the developer responds says a lot about the project.
How do you link the money to the progress of the works?
DECO recommends staged payments, deposit top-ups only when the contract provides for them and never before the matching work, a detailed specification with brands and references, and a works schedule that lets you control deadlines.
I add a rule of my own: each payment should be linked to a stage of the works that can be verified, not just to a date. A date passes by itself. A stage of the works has to be built.
- A completion date with consequences: what happens in case of delay, and from when the delay becomes a breach.
- What “completed” means: finished works are not the same as a home ready for the deed. For the deed, the notary has to confirm that a housing technical file (ficha técnica da habitação) exists and is handed over (Decree-Law 68/2004, article 9).
- Mortgage: if the purchase depends on a loan, the contract should say what happens if the bank does not approve it, as Caixa Geral de Depósitos recommends. The loan usually comes in at the deed, so the deposit and top-ups come out of your savings. I wrote about this in Buying a home with a mortgage in Portugal in 2026.
Which documents should you ask for before buying a home under construction?
The short list I always ask for before anything is signed:
- Building licence, with number and date, to attach to the contract.
- Permanent land registry certificate (certidão permanente), to know who owns the property and whether there are mortgages, seizures or other charges. This is also where you confirm the seller is entitled to sell.
- Provisional housing technical file. When the works are not yet finished, the law requires a provisional version, based on the architecture and engineering projects and certified by their authors (Decree-Law 68/2004, article 4).
- Specification and floor plans with areas, so you know exactly which home you will receive: materials, equipment, finishes.
- Works schedule, which is the calendar against which you will measure payments.
None of these documents is exotic. If one of them does not exist or takes a long time to appear, that delay is information in itself.
What if the home has defects after the deed?
Since 1 January 2022, Decree-Law 84/2021 has extended the liability of those who sell homes to consumers. The professional seller is liable for any lack of conformity that exists at handover and shows up within:
- 10 years, for structural building elements;
- 5 years, for other lack of conformity.
Faced with a defect, you can demand repair, replacement, a price reduction or termination of the contract (article 24). These rights pass to whoever buys the home after you, and lapse three years after you report the defect (article 25). Always report in writing: Caixa Geral de Depósitos suggests registered mail with proof of receipt.
A new home has a warranty period. A vague promise about finishes does not. That is why the specification matters so much: it is what defines “in conformity”.
What changes in a restored historic building?
Buying off-plan and buying in an old building being restored are not the same thing. In a new building, everything comes from the project. In an old building, the walls are already there, and the works find what no drawing foresaw. I explained the cycle of these works in Urban rehabilitation in Lisbon.
For someone who will live there, this comes down to two questions. What stays from the original building and what is new? And what happens to the contract if the works force something to change? The answer should be written, not just said.
There is also a tax point that often goes unnoticed. For IMT (property transfer tax) purposes, a promise counts as a transfer as soon as the home is handed over to the buyer, unless it is for permanent own housing (IMT Code, article 2(2)). If you receive the keys before the deed, check with an accountant first.
This is the kind of home I am working on now: Machadinho 24·32, eight homes from studio to two bedrooms in a restored Pombaline building in Madragoa, with no lift. Sales have not opened yet and prices are on request. Prices are coming soon, and those who leave their details receive them first. If you want to get to know the neighbourhood first, I wrote about living in Madragoa.
Is it worth waiting for a home that does not exist yet?
It depends less on the home and more on the contract. Buying off-plan means accepting a wait. The wait goes better when every euro has a matching stage of the works, every promise has a document and every document has a number.
It is not about speed. It is about clarity.
If you are thinking of buying a home under construction and want to look at a contract or a project with a calmer eye, write to me at contato@thereachrealestate.com or on WhatsApp (+351 912 588 145).
By Rafaela Martins
Reference sources
- Portuguese Civil Code, article 410 (promissory contract), Diário da República (in Portuguese). Accessed 13/11/2026.
- Portuguese Civil Code, article 442 (deposit), Diário da República (in Portuguese). Accessed 13/11/2026.
- Decree-Law 84/2021, 18 October (articles 23 to 25), Diário da República (in Portuguese). Accessed 13/11/2026.
- Decree-Law 68/2004, 25 March (housing technical file, articles 4 and 9), Diário da República (in Portuguese). Accessed 13/11/2026.
- IMT Code, article 2, Portal das Finanças (in Portuguese). Accessed 13/11/2026.
- What a promissory contract should include, Caixa Geral de Depósitos, Saldo Positivo (in Portuguese). Accessed 13/11/2026.
- Bought a new home with defects?, Caixa Geral de Depósitos, Saldo Positivo (in Portuguese). Accessed 13/11/2026.
- Buying off-plan: risks and advantages, DECO PROteste, June 2025 (in Portuguese). Accessed 13/11/2026.